WOC provided post-design services during implementation of the state DOT ADA Transition Plan. Services included providing technical assistance in resolving issues with construction. Often times, construction practices and methods did not coincide with the intent of providing accessibility. A balance of providing a safe pedestrian environment while achieving accessibility was the primary objecting during both the design and construction phases of the project. WOC provided technical guidance to DOT and contractors by developing alternate solutions to situations requiring modifications to the initial designs to facilitate constructability.

Disciplines Provided: Civil and Traffic Engineering