Waikīkī Shell

The Waikīkī Shell is an iconic outdoor venue located between Diamond Head and Waikīkī Beach. Services Provided: Civil Engineering
P-431 Alpha and Bravo Wharf

The wharf extension and improvements will allow berthing for SSBN, and SSGN class submarines and support ships with deeper draft. The design team revised the design of the wharf extension to a more cost effective sheet pile bulkhead wharf to resist the high seismic forces experienced on Guam and to accommodate the submarines. The project […]
P-030 Replace Pier 5

WOC was a sub-consultant providing civil engineering services for the design and preparation of construction documents for a new concrete fixed single deck pier to replace the existing floating Pier 5 (Design-Bid-Build). Landside civil improvements included demolition, site layout, grading, PCC pavement for heavy vehicle loading, vehicle ramps, roadway repaving, traffic control, construction phasing, and […]
P-416 Energy PMRF Power Grid Consolidation

The PMRF Power Grid Consolidation project consolidates the Pacific Missile Range Facility (PMRF) Barking Sands electrical power distribution systems by connecting three of the four independent systems into one continuous Navy operated electrical distribution system. The integration of these grids will require replacing portions of the existing electrical infrastructure with new backbone distribution system and […]
P-662 MDA Test Support Facilities

WOC was a sub-consultant providing civil engineering services for the design of a new single-story Test Support Facility (TSF) on Wake Island (Design-Bid-Build). The facility will support approximately 60 personnel and will include mission execution workspace, office space, conference room, an elevated storage mezzanine, restrooms, mechanical room, electrical room and back-up generator power. Civil work […]
Quad B Renovations at Schofield

WOC provided civil engineering services for the preliminary investigations, parametric design charrette, and value engineering study for the Whole Barracks Renewal Phase 2B, Quad B, Building 156, and Phase 2C, Quad B, Buildings 157 and 158 at Schofield Barrack. The project consisted of renovation and modernizing the historic Quad B Buildings to provide unaccompanied enlisted […]
Global Hawk Aircraft Maintenance and Operations Complex

The Global Hawk Aircraft Maintenance and Operations Complex provides the U.S. Air Force with the required maintenance and operations facilities to support a squadron of Global Hawk unmanned aircraft. As Prime Consultant, WOC was responsible for the preparation of the complete design package of plans, specifications and cost estimates, required to construct this MILCON design/bid/build […]
P-193 Waterfront Improvements for K10/K11, Fleet and Industrial Supply Center

The waterfront improvements consisted of reconstructing 250 feet section of the wharves, constructing 1,510 feet of concrete relieving platform (hardstand), 1,560 feet of concrete pavement, utility improvements and a waterfront transit storage/staging facility, and relocating utilities around the waterfront transit facility. Services Provided: Civil and Structural Engineering
P-112 Construct Pacific Command Headquarters, CINCPAC

The existing command building was originally a hospital constructed in the mid 1940’s. It had been determined from previous studies that costs to renovate the existing headquarters building were approaching the costs to construct a new command facility. Interviews were conducted with personnel to arrive at the conceptual building layout. In preparing the building plan, […]
Advanced Radar Detection Laboratory (ARDEL)

WOC provided civil engineering services for the design of the Advanced Radar Detection Laboratory (ARDEL) facility located at the Pacific Missile Range Facility at Barking Sands, Kauaʻi. The purpose of the facility is to support test and evaluation of a new Air and Missile Radar System being designed for a new class of Navy cruiser […]